Building Commercial — New — install submersible sewage pumps, all required controls and power, install one MCC equipment rack with concrete reinforce pad and all required mechanical ductile iron piping for a SCDHEC permitted sewage pump station. concrete structure only, no building. meter can is not going to be on the rack, it will be on the transformer.