10718 LedererUpfit (interior renovation).- Update main kitchen first floor.- Add new kitchen to basement level.- Move vanity in exisiting basement bathroom.- Reconfigure master bath adding shower, sauna, and toilet.- Add new powder room off front entry.- Add new bathroom in upstairs bedroom.- Install new floors throughout and paint throughout.- Main level laundry update appliances.- Add 3 new ductless washer/dryer combo.- Engineer to submit DRP for new framing and opening walls.to update scope of work to include ** NO LONGER A PART OF SCOPE AS OF 9/15, ONLY WORK THAT WAS INITIALLY BEING DONE **convert attic to residential space per engineer's letter uploaded 6/18/2025 & add half bath with associated e4lectrical & mechanical using existing subs already attached to this system. Split system just for the 300 sq ft attic conversion. This scope is in addition to existing permit for whole house remodel.