Providence HS Storage Building - This project is a replacement for a previous storage building that burned. The existing concrete slab-on-grade will be re-used. Footprint is identical, walls will be load-bearing CMU as previous, light-gage metal trusses, roof sheathing, asphalt shingles. Hollow metal door and frame, sectional overhead door, manual operation. There is no plumbing, mechanical, electrical or civil work on this project.