(HR-MF) Johnston Bldg InteriorStructural Demo/Fram - PROPOSED WORK INCLUDES SELECTIVE INTERIOR STRUCTURAL DEMOLITION AND FRAMING. THIS IS ANOTHER SEQUENTIAL PHASE OF THE PROPOSED ADAPTIVE REUSE OF THE BUILDING, CONVERTING THE EXISTING OFFICE BUILDING INTO A HOTEL. WORK INCLUDES: - CREATION OF FLOOR OPENINGS WITH NEW STRUCTURAL FRAMING TO ACCOMMODATE A FUTURE EGRESS STAIR, SERVICE ELEVATOR AND MECHANICAL/UTILITY SHAFTS. - INFILL OF EXISTING OPENINGS THAT ARE NO LONGER NEEDED WITH NEW STRUCTURAL FRAMING. - CREATION OF ADDITIONAL BASEMENT FLOOR AREA WITH NEW STRUCTURAL SLAB AND FRAMING FOR FUTURE ELECTRICAL AND MECHANICAL SPACE. DOCUMENTATON AND PERMIT APPLICATION FOR THE FULL RENOVATION/CONVERSION TO BE SUBMITTED SEPARATELY.