(MMF) New Main Library - The private fire hydrant on 6th street was removed and the FDC was relocated from the original proposed location on 6th street to the main entrance on Tryon Street which is within max allowable distance to an existing hydrant. These revisions were coordinated with CFD. - The gas meter was relocated to the exterior trash enclosure in lieu of the original proposed location. Gas pipe routing was revised to come off College Street. These changes were coordinated with PNG. - Minor revisions have occurred on the drawings (structural, stairs, elevators, details, etc.) during construction coordination and clarification.