KO.S Bar and Grill - 1.) REPLACE ALL INTERIOR OFFICE DOORS WITH GLASS DOORS AS SHOWN. EXISTING CLOSETS 109 & 110 AND RESTROOMS (112 & 113) DOORS TO REMAIN.G.C. TO PROVIDE DOOR SPEC. 2.) REMOVE (3) OFFICES FROM PREVIOUS LAYOUT FOR LARGER OPEN OFFICE AREA. 3.) INSTALL NEW GLASS DOOR IN HALLWAY 124. 4.) RELOCATE DOOR IN CONFERENCE ROOM 116 5.) DEMO PORTION OF 8X13'-5" WALL IN CONFERENCE ROOM 116 AND BREAK ROOM 115 FOR NEW OPENING. PROVIDE STRUCTURAL SUPPORT AS REQUIRED FOR NEW HEADER. 6.) INSTALL NEW LVT IN CLOSET 110, BREAK ROOM 111, CONFERENCE ROOM 111, BREAK ROOM 115 AND HALLWAY 124. 7.) INSTALL CARD READERS AT FRONT ENTRY AND BACK WAREHOUSE DOOR. 8.) CONFERENCE ROOM 116 & BREAK ROOM 115 SHALL HAVE DIMMABLE LIGHTS ON NEW SWITCHES. 9.) BREAK ROOM 111 SHALL HAVE NEW 21'-11" UPPER & LOWER CABINETS WITH NEW BREAK SINK AND DISH WASHER, AND NEW 6'-10" COUNTERTOP. PROVIDE WATERLINE FOR DISHWASHER AND FUTURE ICE MAKER. 10.) REF CONNECTION HAS BEEN RELOCATED IN BREAK ROOM 111. 11.) additional electrical outlets added throughout new layout