KIPP Kitchen Renovation - Addition of one three-compartment sink, one two-compartment sink, and two hand-washing sinks to existing Warming Kitchen at this K-5 charter school. All sinks will be located within the existing Warming Kitchen space, one had-wash sink will be located just outside of the Warming Kitchen on adjoining wall.