110 East Adaptive Reuse Retail - 1) PORTION OF EXISTING EQUIPMENT ON SECOND FLOOR TO BE SALVAGED, REVISED DEMO PLANS PROVIDED.2) RELOCATE TRASH CHUTE TO ACCOMODATE THE SALVAGED EQUIPMENT NOTED ABOVE, COMPACTOR EQUIPMENT REMOVED FROM TRASH ROOM. UPDATED ON PLANS AND SECTIONS.3) RELOCATE DUMBWAITER SHAFT TO ACCOMODATE THE SALVAGED EQUIPMENT NOTED ABOVE, UPDATED ON PLANS AND SECTIONS.4) SECOND FLOOR EGRESS DOOR TO BE RELOCATED TO ACCOMODATE THE SALVAGED EQUIPMENT NOTED ABOVE, UPDATED IN PLANS AND ELEVATIONS.5) GREASE INTERCEPTOR TO BE INCREASED IN SIZE PER TENANT REQUIREMENTS, UPDATED PLUMBING PLANS TO INCORPORATE. ASSOCIATED GENERATOR SPECIFICATION FOR PUMP PER CIVIL TO BE ADDED TO ELECTRICAL PLANS.6) PER DISCUSSION WITH FIRE, UPDATE FP DRAWINGS TO REFLECT DRY SYSTEM IN ATTIC AND RELOCATED FIRE RISER WITHIN 10 FEET OF BUILDING WALL.7) REMOVE DEMISING WALL ON LEVEL 1 TO ALLOW FOR A SINGLE SHELL SPACE.8) RECLASSIFY PRIMARY BUILDING OCCUPANCY TO A-2 FOR RESTAURANT USES - REFER TO APPENDIX B.8) DUE TO DAMAGE OBSERVED TO EXISTING SANITARY LINE, NEW SANITARY LINE TO BE PROVIDED, REFER TO PLUMBING PLANS.