(HR) 110 East Ground Level Division - Modification of the existing ground floor shell space of the base building to divide into (2) shell spaces in preparation for future retail tenant build outs to be done under future separate permits. Conduit extension stub outs for future tenant build outs under future separate permit (not a part of this scope). Addition of lights and exits signs, and fire strobes for shared service corridor between shell spaces. Extension of toilet exhaust for future tenant build outs under future separate permit (not a part of this scope). Fire Dampers installed on existing ducts at new 1 hour demising wall, separating shell retail spaces. Capped Extensions of existing cold water, venting, sanitary and gas lines into existing shell spaces for future retail tenants (under future separate permit, not a part of this scope)