(HR) 2T Enabling for Bed Tower North Bridge - Project is enabling work in the existing hospital for connection to the new Bed Tower bridge on levels 2 and 3. To do the work the 9 story strip Storefront (existing windows) of the South Elevation vestibule must be replaced by Curtainwall (new windows) and enlarged openings made in the prefabricated exterior. Cost is included in the Bed Tower project. The Architectural sheets were all previously submitted with the Bed Tower project. The work on CMC main has been isolated in the drawings in this set.