Park Road Elementary School - RV-460194-002 Building 2 Added Haven Drive roadway improvements to project scope including new sidewalk w/ 30 curb & gutter, removal/replacement of asphalt parallel parking spaces with a planting strip, Relocated fire main tap from Haven Dr to Hillside Ave for a new 8 service (was previously 6), Added an ADA sidewalk from the playgrounds at the bus lot to a lower open space for recreation (near the underground detention), Expanded disturbed limits at misc. locations for the scope additions, Revised stormwater calculations based on the changes in impervious areas