River District Phase 1 (Temporary) Firehouse - Architectural: The stairs and ramp to the Modular Building has been modified to account for site grading. Structural: The stairs and ramp to the Modular Building has been modified to account for site grading. Electrical: An additional electrical panel was added to the Modular Building drawings by the manufacturer. Power Riser Diagram has been revised, underground conduit on the Electrical Site Plan has been revisedFuel System: The number and size of fuel tanks has been changed per the Owner's request.Modular Building: The Foundation plan originally submitted and approved was "typical" and not designed for this specific site. An updated Foundation plan designed for the site and its conditions is being submitted.