PermitCommercial

Dockzilla Temporary Soiled Loading Dock

Mecklenburg County · Charlotte · 8/29/2025

We are constructing a temporary loading dock that will serve as the soiled loading dock during our main construction activities of the loading dock expansion and renovation. The purpose of the temporary loading dock is to ensure that the day to day operations of Atrium's loading dock on the main campus are not interrupted and can operate at full capacity during construction. The temporary loading dock is an engineered system provided by a company called Dockzilla. The reason for permitting is because the Dockzilla structure will be in place longer than 6 months.

Type
Permit
Topic
Commercial
Jurisdiction
Mecklenburg County, Charlotte
Source agency
Mecklenburg County GIS
Document date
8/29/2025
Last verified
5/25/2026
Address
1000 BLYTHE BLVD, CHARLOTTE, NC 28203
Parcel ID
15301124
Value
$613,500
Case #
B4825310
View original source