Solventum QC and Development Labs - A remodel in an existing area of the facility is required to relocate a lab(QC Lab) from a different area of the facility. This will require movingwalls and rerouting mechanical and electrical utilities.Upon completionof the remodel, the QC Lab will be relocated to the newly-remodeledspace.The old location of the QC Lab will have miner utilitymodifications in preparation of the installation of a new processequipment (a Drawframe).